Class E Overhead Cranes for Steel Supply Center Expansion

The Customer

A steel supply center in Nashville, TN, operating three shifts per day, six days a week: The customer receives, handles, and loads high volumes of steel for delivery to its customers.

The company constructed a new industrial warehouse and needed two new overhead cranes capable of supporting increased steel handling and production.

The Challenge

With the new facility designed to significantly increase the amount of steel the customer could process, they needed cranes that could reliably keep pace with an intense production schedule.

Excel Industries needed to design and build two 20-ton overhead cranes that were operator-friendly, robust, and capable of handling an extreme workload with minimal downtime. Because the cranes would be used throughout multiple shifts nearly every day of the week, standard heavy-duty equipment was not enough. The new cranes needed to meet a Class E severe-duty cycle and provide the durability required for demanding, high-volume steel handling.

Long-term serviceability was also critical. The customer wanted equipment that would be straightforward to maintain and repair, with readily available components that could help minimize downtime and keep production moving.

The Solution

Excel Industries designed and built two 20-ton overhead cranes specifically for the customer’s severe-duty steel handling application. The cranes were engineered around the required Class E duty cycle to provide the performance and durability needed for continuous operation in a busy industrial environment.

To give operators precise, smooth control while moving heavy loads, Excel Industries incorporated VFD controls into the crane systems. The cranes were also equipped with magnets, providing an efficient way for operators to pick up and move individual pieces of steel or groups of material throughout the facility.

The systems were designed for the speed required to support the customer’s high-volume workflow including:

  • Bridge travel speed: 275 feet per minute
  • Hoist speed: 55 feet per minute
  • Trolley travel speed: 85 feet per minute

Before leaving Excel Industries’ shop, the new cranes underwent thorough inspection and testing. Following installation, the Excel Industries team also tested the cranes and supporting structure to confirm that the completed systems were ready for operation.

Excel Industries completed the on-site installation of both 20-ton cranes in the customer’s new Nashville, TN warehouse in just three days, helping the customer get its expanded operation up and running quickly.

The Result

The two new severe-duty overhead cranes gave the customer the material handling capacity needed to take full advantage of their facility expansion. With fast travel speeds, smooth VFD controls, and magnetic lifting capabilities, operators can efficiently move steel throughout the warehouse and prepare material for outbound truck loading.

The new crane systems enabled the steel supply center to double its output. The customer can now move a substantially higher volume of steel while relying on equipment specifically designed for the demanding duty cycle of its operation.

By combining application-specific crane engineering with a fast three-day installation, Excel Industries delivered a robust, maintainable solution that helped the customer quickly scale production while prioritizing reliability and long-term durability.

Do you need a custom crane for your industrial facility? Contact us today to get your project started!