Four Cranes Built in Less Than a Week

Four Cranes Built in Less Than a Week
Mounted Crane
Crane Load Test
Weights for Crane Load Test
New Crane Load Test
Crane Load Test 2
Beams for Crane Construction
Excel Industries Factory
I-beams in Excel Industries Factory
Cherry Picker in Excel Industries Factory
Excel Industries Modern Crane Factory
The Floor of Excel Industries Crane Factory
Assembling a Crane
Close up of Crane Construction
Overhead Crane Construction
Crane Construction
Overhead Cranes at Excel Industries
Four Cranes Built in Less Than a Week
Mounted Crane
Crane Load Test
Weights for Crane Load Test
New Crane Load Test
Crane Load Test 2
Beams for Crane Construction
Excel Industries Factory
I-beams in Excel Industries Factory
Cherry Picker in Excel Industries Factory
Excel Industries Modern Crane Factory
The Floor of Excel Industries Crane Factory
Assembling a Crane
Close up of Crane Construction
Overhead Crane Construction
Crane Construction
Overhead Cranes at Excel Industries

Installation and Runways

Installation of the cranes was also done by Excel Industries installation team. Job deadline was tight, but Excel beat the deadlines given by customers. All four cranes where built in less than a week. All cranes were installed on the same day, in one long working day.

Runways were built in less than three weeks, and all runways, were installed in less than two weeks. Runways consisted of two 10 ton free standing runways 100' long each, and the one 50 ton free standing runway 585' long. The cranes requested were two 10 ton cranes, 50' span, and two 25 ton cranes, 55' span.